Clear, practical explanations about renovations, permits, property documents, safety and technical services.

FAQ

Clarity from
the first question.

These answers explain the most common questions, but the appropriate procedure always depends on the property and the individual circumstances.

All services ↗
01Where should I start if I want to renovate a property?

Start by assessing the property as it stands. An inspection, measurements and a review of existing building and land-registry records help establish what may be feasible. From there, the necessary procedures, potential authorisations and a practical sequence of works can be considered. It is useful to clarify these points before finalising costs and deadlines with contractors.

02What is the difference between CILA, SCIA and a building permit?

CILA – Certified Commencement-of-Works Notice. Generally used for extraordinary maintenance that does not affect load-bearing elements or façades and does not entail a planning-relevant change of use. Examples include relocating non-structural partitions, rearranging rooms or renovating a bathroom with plumbing alterations. Basic ordinary maintenance may require no building filing.

SCIA – Certified Start-of-Activity Notice. This may apply where building works affect structural elements, such as creating an opening in a load-bearing wall or altering a floor structure, and to certain conservation and renovation works specified by law. Seismic requirements and other permits may also apply.

Permesso di Costruire – Building Permit. Generally required for new construction, extensions and substantial building transformations, including particular categories of major renovation. In specific cases the law allows an alternative SCIA procedure.

Which one should I use? The value or size of the project alone does not determine the correct procedure. The property’s lawful building status, the proposed work, any restrictions and national, Tuscan regional and municipal rules must be reviewed (D.P.R. 380/2001 and Tuscany Regional Law 65/2014). These examples are illustrative, not a substitute for project-specific advice.

03Which documents are useful when starting a building procedure?

Where available, useful documents include the ownership deed, cadastral floor plan, previous building permits and drawings, any earlier applications and photographs of the property. Some assignments also require authorisations or other documents. Missing records can be identified during the initial review and, when necessary, requested from the municipality.

04Is cadastral compliance the same as planning and building compliance?

No. Cadastral records identify and describe a property for land-registry purposes, whereas planning and building compliance is assessed against the permits and records supporting its lawful construction and subsequent changes. An up-to-date cadastral plan does not, on its own, establish that every building alteration is authorised. Both aspects should be checked, especially before renovations or sales.

05What is an APE energy certificate and when might it be needed?

The APE (Attestato di Prestazione Energetica) is Italy's Energy Performance Certificate. It summarises the energy characteristics of a building or unit under the applicable rules. It may be needed for property sales, new leases and certain building works, subject to statutory exceptions. Preparing one involves examining building characteristics, technical systems and available documentation.

06What should be checked before selling or buying a property?

It is sensible to compare the actual property with cadastral and planning records, identify possible discrepancies and review any required energy certificates and supporting documentation. Starting early can reveal issues that need clarification or further action before the notarial deed is signed.

07When is a construction safety coordinator (CSP/CSE) required?

When are CSP and CSE required? Where a construction project is expected to involve two or more executing companies, even if they work at different times, the client or person responsible for the works will generally have to appoint safety coordinators. For example, one company handles masonry and a separate firm subsequently carries out electrical work. The requirement should be checked before work starts under Legislative Decree 81/2008.

What are their roles? The CSP (design-stage coordinator) assesses safety risks during project preparation and, where required, prepares the safety and coordination plan (PSC) and other relevant documentation. The CSE (construction-stage coordinator) coordinates contractors during construction, checks safety measures and reviews the consistency of companies’ operational safety plans (POS).

Are there exceptions? For private works costing less than €100,000 that do not require a Permesso di Costruire, the CSE also performs the CSP’s functions. If only one company carries out the works, a coordinator is not normally required; however, the client and contractor must still comply with the relevant safety requirements. If a second executing company joins later, the appointment of a CSE may become mandatory.

Are the PSC and preliminary notification always required? No. The PSC is required in the cases laid down for coordination, while preliminary notification to the authorities depends on the circumstances identified in Article 99 of Legislative Decree 81/2008. The companies involved and the nature of the works must be reviewed before the site starts operating.

08What is the ETC roof technical dossier in Tuscany?

The Elaborato Tecnico della Copertura (ETC) is a technical dossier describing risks and preventive or protective measures for safe access to and future maintenance of a roof. It may include drawings, access routes, protective systems and device documentation. In Tuscany its requirements are governed by Regional Regulation 75/R/2013, as amended; applicability and required content depend on the specific works.

09When can drone surveys be useful?

Aerial photography can help document roofs, façades and outdoor areas that are difficult to view from ground level. It can support inspections, monitoring, drawings and preliminary assessments, although it does not necessarily replace direct measurements. Each flight must also be assessed in light of safety, authorisation and privacy requirements.

10What determines the time and cost of a technical procedure?

Timing and fees vary with the scope of the work, the project's complexity, available records and any opinions or authorisations needed. Administrative timescales also depend on the procedure and public authorities involved. A brief description and, when necessary, an initial technical review help define a realistic scope and quotation.

11How can I request a quotation from the studio?

You can use the Contact page to describe the property, its municipality and the work or service you need. Photographs and available documents may help with an initial assessment. The studio can then clarify whether more information or an inspection is required before setting out the professional services to be included in a quotation.